The Maynard Aquatics Center located at Burlington City Park is undergoing a facelift with the construction of a new enclosed structure. This structure will replace the original air inflated "bubble", that once stood over the aquatics center since it opened in 1998.
The new cover is a metal framed structure with vinyl panels that can be removed during warmer months for sun or shade or added during the colder months for warmth.
It is the goal of the department to re-open the center in late September early October, once structural, electrical and heating units have been added. To view construction progress, please visit the following link.